High Quality Professional Doughnuts Maker is with its own character, so it must be tested before using, then we can make wonderful donuts or cake. The proportion of ingredients is that 1KG of cake donuts flour, 400G of water, 300G of oil, 3 eggs.
1. First, mix the donuts flour and water. Please be slow at the beginning 2 minutes, and then turn faster for the next 18 minutes. Then leave the mixture indoor for 30 minutes above te mperature 22-24 Celsius degree. Temperature is controlled by micro computer with ±1°C, so it is very convenient and safe.
2. The machine is made of high-quality stainless steel, the high-quality material will make the machine very lasting. Beside, the workmanship is very good, so it will save you much trouble to mend it.
3. The machine has light weight of 8KG and very portable. With full instructions in English, it will help you use it easily. Donuts’ thickness can also be adjusted by adjusting the amount of materials.
4. The more material, the thicker and bigger is the produced donuts; the less , the smaller and thinner is the produced donuts. The operation is simple and of high efficiency. What you need do is just to put the prepared dough in the mold, close it and set the temperature and time, then the beautiful and yummy donut or cake is finished.
5. When the machine is linked to electricity, the red light is on; when the machine is heating, the green light is on.
6. The machine is very well welcomed and is the best choice to a variety of stores, food plants, etc. As for this machine is 220V 50HZ, so if we want to use the 380V power, we should be according to the wiring diagram in the Manual.
1.Can change the voltage and plugs or not ?
We are manufacturer, mostly products we can change the voltage and plugs. Pls kindly tell me the voltage and plugs that you need before the order.
2.What Methods of Payment Are Acceptable?
Telegraphic Transfer (T/T): we accept 30% T/T deposit before production and 70% T/T Balance before shipment. 100% payment for sample orders.
Western Union: we accept 100% payment via the western union.
3.What is the procedure for making claims for damages or shortages?
All of our products will get fully test before delivery. All shortages must be reported to us within 7 days of receiving the shipment. If the goods were made by carriers then damages need to be reported to them and us. Please make sure that you keep the original shipping box for them to inspect. So please report to us damages made by carriers so that we may file a claim on your behalf.